Boise State University Greenbelt Boise, Idaho

McKibben + Cooper in association with Joseph LaMarche Architect (phase 1) and Ivy Design, completed a Master Plan and the first 2 construction phases of the Campus Lane Improvements; including the Boise River Greenbelt. Phase 1 features a new landing at the Friendship Bridge that provides a termination for Memorial Quadrangle, the heart of the BSU campus. Phase 2 continues west to the Morrison Center, separating the Greenbelt path from Campus Lane with a new median which collects runoff and incorporates concrete "seatwalls" that provide a visual barrier for vehicles. Pedestrian intersections at Brady street and the Education building are marked with geometric paving and seating.